BURSA TIMSAH ARENA STADIUM

Project Data:

  • Location: Bursa, Turkey

  • Client: Bursa Metropolitan Municipality 

  • Architecture Design: Sözüneri Mimarlık

  • Main Contractor: Gintaş Construction Inc

  • Project Manager: Mustafa TOPALOĞLU

  • Project Coordinator: Zafer TOLUNAY

  • Site Engineer: Ali BAŞGÜL

  • Tonnage Capacity: 7,200 Ton 

  • Project Period: January, 2016 - June, 2018

  • Work Description: CERM-EX has been responsible for structural design, steel fabrication, project management and assembly of the roof, stairs and crocodile shape of the stadium.

  • Brief Summary of the project: The concept of Bursaspor’s new stadium was created in 2010, when the club reached for their historical first domestic championship. The stadium resembling a resting crocodile received global recognition for its original, yet controversial appearance. The outer shell consists of green glass and membrane partly overlapping the glass.
    Internal appearance is also unique. There are two massive single-tiered stands behind goals, the east side has two levels, while main grandstand in the west has three tiers. Atop all of it are over 70 skyboxes.
    Construction began in 2011 and was due to end in 2013-2014, but eventually proceeded into 2015.

MORE INFORMATION

Timsah Arena Stadium Information Sheet

Bursa_timsah_stadium_cover_page.JPG

CONTACT OUR TEAM

WhatsApp Image 2019-12-12 at 16.24.23.jp

Kadir Gencer
Director, Structural Steel Fabrication Manager

Contact Kadir Gencer

Our Partner in this Project

image.png

®

Talk to us

Discover how we can help you move your project forward

WhatsApp Image 2019-12-12 at 16.24.23.jpeg

Kadir Gencer

Director, Structural Steel Fabrication Manager

Featured Projects

bottom of page