CERM-EX COLD-FORMED STEEL STRUCTURES
Our cold-formed steel profiles are used for all types of construction projects. We design different sizes and thickness of steel profiles. All our projects are produced according to precise specifications.
- Cold-formed profiles
- Custom-made production
- Profiles available in different widths: from 75 mm to 250 mm.
- Steel gauge: 0.70 - 2.00 mm
- Excellent protection against corrosion.
Advantage of Cold-Steel Framing
Cold -formed steel framing technology, also known under the name of light steel framing structures, is a construction technique that i already widely used in numerous countries. This method undoubtedly as many advantages.
Sustainability
A considered and sustainable choice for the generations to come.
Accuracy
The profile sections are made within an accuracy of 0.1 mm.
Strength
Light gauge steel material is used to give the highest resistant/weight ratio in the world
Lightness
CERM-EX offers a light gauge construction solutions.
Quick
A light steel framework gives a significant time-saving on site.
Who are CERM-EX's frame aimed at?
Private Customer
Are you looking for a sustainable construction method?
Choose light steel framing from CERM-EX.
You are already working with a contractor/architect:
Ask them to contact us in order to discuss particulars with us.
You don't have a contractor/ architect yet:
We can put you in contact with one of our partners in your region.
Contractors
We supply our steel frames to contractors and construction companies. We send requests for information from private customers regarding construction project to our partners.
Would you like to become our partner?
Please contact us for more information.
Architect
- Design and drawings
- Stability study
- Light steel framing production
Construction
Project
Contractor
- Erection on site and cladding
SABIHA GOKCEN INTERNATIONAL
TERMINAL
Project Data:
-
Location: Istanbul, Turkey
-
Client: Limak Construction (Turkey) – GMR (Malaysia) JV
-
Main Fabrication Contractor: Temsan Inc
-
Project Area: 40,000 m2
-
Project Period: May, 2008 - October, 2009
-
Tonnage Capacity: 7000 Ton
-
Work Description: The construction of the new international terminal building of Istanbul Sabiha Gökçen International Airport and its supplementary was started on May 1, 2008 by Limak-GMR Ordinary Partnership and while investment period was 30 months, it was put into service on October 31, 2009, corresponding to 18 months, which is a record when such size and technical specifications are considered.
MORE INFORMATION
Istanbul Sabiha Gökçen Airport Project Information Sheet
Winning several awards for its architecture, construction quality and management during a short time period, Istanbul Sabiha Gökçen International Airport was selected one of top 5 safest airports in the world by risk Management Magazine, one of the most prestigious magazines of the United States, based on the surveys conducted in 2010.
Our Partner in this Project
®
Talk to us
Discover how we can help you move your project forward
Kadir Gencer
Director, Structural Steel Fabrication Manager
Featured Projects